Supply of certified maize seeds
-distribution of ceryified maize seeds Duma 43 to farmers accross the
ward
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 4,000,000
Mbitini
Manooni Ecde
Construction of 2no. ECDE Classrooms with an office & store, Electrical conduit, shelving to the stores, lockable metallic cabinet, Wooden Desk, Wooden Arm Chairs, Water harvesting goods (10,000Ltrs Water Tank and base), 40 No. Kiddy chairs and 20. No. Kiddy tables, Play equipment 4 piece set (double swing, slide, climbing frame and double see-saw), Display soft board and Branding, Publicity and Signwriting
Department of ICT, Education and Internship
Completed
Ksh 3,600,000
Mbitini
Issuance Of Birth Certificates -mbitini
Issuance of birth certificates -Issuance of birth certificates across the ward
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 200,000
Mbitini
Tents And Chairs- Mbitini
Purchase and Issuance of tents and chairs
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 1,000,000
Mbitini
Mbeletu Playground
Levelling works
Department of Gender, Children, Youth, Sports and Social Services
Facilitation For Issuance And Replacement Of Ids At Kwa Mutula,kithumani And Mbuthani- Mbtini Ward
Facilitation for Issuance and replacement of IDs at Kwa Mutula,Kithumani and Mbuthani
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 300,000
Mbitini
Rabies Vaccination
Rabies
vaccination
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 500,000
Kikumini/Muvau
Itaa Water Project
Itaa
Water Project
Department of Water and Sanitation
Completed
Ksh 500,000
Kikumini/Muvau
"drilling, Distribution Of Nzueni Borehole -drilling, Solarization And Pumping Unit, Fencing Of The Solar Structure, Rehabilitation Of Existing Structures Raising Line From Beach To Nzueni Hill 1.5 Km And Return Pipe And Masonry Tank 50m³. 2 Water Kiosks And Plastic Tanks At Matithini Market And Kwa Kituvu Junction"
Drilling,
distribution of Nzueni borehole
-Drilling, solarization and pumping unit, fencing of the solar structure,
rehabilitation of existing structures raising line from Beach to Nzueni hill
1.5 km and return pipe and masonry tank 50m³. 2 water kiosks and plastic
tanks at Matithini market and kwa Kituvu junction
Kwa Ngoka Borehole - Drilling, Equipping And Distribution Of Kwa Ngoka Borehole, Construction Of A Water Kiosk At Point Source, Installation Of 10 000 M3 Plastic Tank
Kwa
Ngoka Borehole - Drilling, equipping and distribution of Kwa Ngoka borehole,
Construction of a water kiosk at point source, installation of 10 000 m3
plastic tank
Solarization And Installation Of Water Pump At Kwambila Earth Dam And Extension Of The Same Project From Kiuuku Market To Kasayani Market And Also From Kiuuku Market To Bosnia
Solarization
and installation of water Pump at Kwambila Earth Dam and extension of the
same project from Kiuuku Market to Kasayani Market and also from Kiuuku
Market to Bosnia
Construction of 1no. ECDE Classroom with an office & store, Electrical conduit, shelving to the stores, lockable metallic cabinet, Wooden Desk, Wooden Arm Chairs, Water harvesting goods (10,000Ltrs Water Tank and base), 40 No. Kiddy chairs and 20. No. Kiddy tables, Play equipment 4 piece set (double swing, slide, climbing frame and double see-saw), Display soft board and Branding, Publicity and Signwriting
Department of ICT, Education and Internship
Completed
Ksh 2,500,000
Kitise/Kithuki
Yekanga Borehole - Drilling,equipping And Distribution Of Yekanga Borehole, Construction Of A Water Kiosk At Point Source, Installation Of 10 000 M3 Plastic Tank
Drilling,equipping And Distribution Of Yekanga Borehole, Construction Of A Water Kiosk At Point Source, Installation Of 10 000 M3 Plastic Tank
Department of Water and Sanitation
Completed
Ksh 3,123,760
Kitise/Kithuki
Agriculture Development Programme -provision Of Certified Seeds (maize And Beans}, Supply Of Certified Avocado And Macadamia Seedlings
Agriculture Development Programme -Provision
of certified seeds (Maize and beans}, supply of certified Avocado and
Macadamia seedlings
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 1,000,000
Mbooni
Roads Maintenance/grading/murraming Programme -routine Road Maintenance, Construction Of Road Structures Such As Culverts And Drifts And Murraming
Support Agricultural Saccos Distribution Of Certified Farm Inputs-seedlings, Fertilizer, Pestcides,farmers Training On Smart Agriculture Rehabilitation Of Tulimani Satelite(electricity Drop And Wiring)
Support
Agricultural Saccos Distribution of certified farm inputs-seedlings,
fertilizer, pestcides,Farmers training on smart agriculture Rehabilitation of
Tulimani satelite(Electricity drop and wiring) -Support Agricultural
Saccos,Distribution of certified farm inputs-seedlings, fertilizer,
pestcides, Farmers training on smart agriculture and Rehabilitation of
Tulimani satelite
Support
Agricultural Saccos Distribution of certified farm inputs-seedlings,
fertilizer, pestcides,Farmers training on smart agriculture Rehabilitation of
Tulimani satelite(Electricity drop and wiring) -Support Agricultural
Saccos,Distribution of certified farm inputs-seedlings, fertilizer,
pestcides, Farmers training on smart agriculture and Rehabilitation of
Tulimani satelite(Electricity drop and wiring)
(Electricity drop and wiring)
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 2,700,000
Tulimani
Kango Borehole Distribution - Pipeline Extension From Kango Borehole To Kwa Mutisya Market (pipeline, Water Kiosk And 10,000l Tank On Platform)
Kango
Borehole distribution - Pipeline extension from Kango borehole to Kwa Mutisya
market (pipeline, water kiosk and 10,000L tank on platform)
Kakuswi Ctti-construction Of Soak Pit And Installation Of Gutters
Construction of soak pit and installation of gutters
Department of ICT, Education and Internship
Completed
Ksh 1,000,000
Kisau/Kiteta
Support To Farmers - Supply Of Manure-fuel
Support to farmers - supply of manure-fuel
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 800,000
Kako/Waia
Pest And Disease Control For Mango Value Chain
Pest and disease control for mango value
Chain-Provision of fruit fly traps for Mango value chain
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 1,000,000
Kako/Waia
Rehabilitation And Extension Of Kwa Makaia Borehole Water Project. Rehabilitation Of Kisoi Munyao Health Center And Muiu Market Water Line And Extension To Kwa Mutumba Mwaani To Sofia Towards Kyangondu Market
Rehabilitation
and extension of kwa Makaia Borehole water project. Rehabilitation of kisoi
Munyao Health center and Muiu Market water line and extension to kwa Mutumba
Mwaani to Sofia towards Kyangondu Market
Department of Water and Sanitation
Completed
Ksh 4,000,000
Kako/Waia
Road Improvement Kako/Waia
Road grading across the ward 4.5km Mbumbuni Market-Kwa Ndikita-Kyangondu Junction, 12.4km Watuka-Kako-Ngovu-Kavingo Road, 9.3km Watuka-Mituvu-Kandulyu-Kako Secondary School Road
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 1,000,000
Kako/Waia
Mituvu Ecde
-Construction of 2no. ECDE Classrooms with an office & store,3-Door Pit Latrine with Urinal, Electrical conduit, shelving to the stores, lockable metallic cabinet, Wooden Desk, Wooden Arm Chairs, Water harvesting goods (10,000Ltrs Water Tank and base), 40 No. Kiddy chairs and 20. No. Kiddy tables, Play equipment 4 piece set (double swing, slide, climbing frame and double see-saw), Display soft board and Branding, Publicity and Signwriting
Akwash Project – (a. Extension Line From Katoloka To Kathongo (1 Kiosk At Kathongo); B. Extension Line From Kwa Kaoka To Kyanganga Aic (1 Kiosk); C. Extension Line From Katoloka To Kakuli; And D. Extension Line From Syongungi Market To Munyuni Market)
AKWASH
Project – (a. Extension line from Katoloka to Kathongo (1 Kiosk at Kathongo);
b. Extension line from Kwa Kaoka to Kyanganga AIC (1 Kiosk); c. Extension
line from Katoloka to Kakuli; and d. Extension line from Syongungi Market to
Munyuni Market)
Bush clearing and spot murraming 1.7km Kwa Maria-Kwa Kyengo-Athi River Road, 1.8km Kwa Kyengo-Kwa Richard Road, 2.2km Juntion Kathulumbi-Ngomano Road, 1.9km Kwa Kyengo-Kwa Richard Road, 11km Katangini-Kalawa Market
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 400,890
Kalawa
Rehabilitation Of Mbondoni Borehole-purchase And Installation Of Solar Panels And Rewiring
Rehabilitation
of Mbondoni borehole-Purchase and installation of solar panels and Rewiring
Department of Water and Sanitation
Completed
Ksh 500,000
Kiima Kiu/Kalanzoni
Rehabilitation And Catchment Conservation Of Ikaasu Earthdam
Preparation of embankment and breach section
Backfilling of breach section with compaction
Raising of the embankment wall by 1 meter
Desilting of the dam
Relocation of spillway from LHS to RHS
Construction of 26 gabion units
Stone pitching works covering 60 m²
Department of Lands, Urban Planning and Development, Environment and Climate Change
Completed
Ksh 5,000,000
Kiima Kiu/Kalanzoni
Kwa Kaluli Dispensary-construction Of Septic Tank And Drainage
Construction of septic tank and drainage system for the facility
Provision Of Certified Seeds (maize And Beans)adaptive To Mukaa Climate.
Provision of certified seeds (maize and
beans)adaptive to Mukaa climate. -Purchase and distribution of adequate
certified seeds(maize and beans). Distribution to be done before the onset of
rain season.
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 3,000,000
Mukaa
Rehabilitation Of Kwa Kulundu Water Project
Rehabilitation
of Kwa Kulundu water project
Department of Water and Sanitation
Completed
Ksh 792,471
Mukaa
Rehabilitation Of Kwa Kulundu Borehole
Rehabilitation
of Kwa Kulundu Borehole
Department of Water and Sanitation
Completed
Ksh 250,000
Mukaa
Conservation Programme
Road survey and design Grading and gravelling Drainage works( Culverts, side drains) Community mobilization
Department of Lands, Urban Planning and Development, Environment and Climate Change
Fruit value chain development -Provision of
Mango and Avocado scions for grafting of existing fruit trees
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 500,000
Kee
Provision Of Agricultural Inputs Of Certified Seeds
Provision of Agricultural inputs -Provion of
certified seeds (maize and beans), pasture seeds and support to subsidized AI
services
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 2,500,000
Kee
Kyamwalye Ecde
Construction of 1no. ECDE Classroom with an office & store, Electrical conduit, shelving to the stores, lockable metallic cabinet, Wooden Desk, Wooden Arm Chairs, Water harvesting goods (10,000Ltrs Water Tank and base), 40 No. Kiddy chairs and 20. No. Kiddy tables, Play equipment 4 piece set (double swing, slide, climbing frame and double see-saw), Display soft board and Branding, Publicity and Signwriting
Department of ICT, Education and Internship
Completed
Ksh 2,500,000
Kee
Kitandi Ecde
Construction of 1no. ECDE Classroom with an office & store, Electrical conduit, shelving to the stores, lockable metallic cabinet, Wooden Desk, Wooden Arm Chairs, Water harvesting goods (10,000Ltrs Water Tank and base), 40 No. Kiddy chairs and 20. No. Kiddy tables, Play equipment 4 piece set (double swing, slide, climbing frame and double see-saw), Display soft board and Branding, Publicity and Signwriting
Avocado Value Chain -supply Of Locally Sourced Certified Seedling
Avocado Value Chain -Supply of Locally
sourced certified seedling (Kshs. 0.5 for grafting (labour) and Kshs. 1m for
purchase of locally sourced certified seedlings)
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 1,500,000
Ilima
Isovya Ecde
Construction of 2no. ECDE Classrooms with an office & store, Electrical conduit, shelving to the stores, lockable metallic cabinet, Wooden Desk, Wooden Arm Chairs, Water harvesting goods (10,000Ltrs Water Tank and base), 40 No. Kiddy chairs and 20. No. Kiddy tables, Play equipment 4 piece set (double swing, slide, climbing frame and double see-saw), Display soft board and Branding, Publicity and Signwriting
Fuel For Road Opening in Nguumo ward Using County Machinery
Road improvement along 3.3km
Spot gravelling of Kibarani-Wiivia road, 0.8km Hardcore filling at Kibarani
shopping center and 0.3km Hardcore filling at Kiundwani shopping center
Department of Infrastructure, Transport, Public Works, Housing and Energy
Support To Emali/mulala Farmers Sacco-funding The Sacco
Support to Emali/Mulala farmers SACCO-Funding the SACCO(Transfer of funds)
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 1,000,000
Emali/Mulala
Installation Of Drift At Tutini-kwa Maima Road
Installation of 45M by 6mdrift and 20 No. gabions along Tutini-Kwa Maima road
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 5,500,000
Emali/Mulala
Installation Of Road Structures Along Kwa Kausha Mulala Road
Installation of 8m culvert, 8 No. gabions and 35M keywall along Kwa Kausha Mulala Road
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 1,000,000
Emali/Mulala
Mulala Primary Borehole - Borehole Drilling And Development With Casing, Solar Pumping System, 50cum Main Reservoir. Communal Water Point And Connection To Mulala Girls
Borehole Drilling And Development With Casing, Solar Pumping System, 50cum Main Reservoir. Communal Water Point And Connection To Mulala Girls
Department of Water and Sanitation
Completed
Ksh 3,994,680
Emali/Mulala
Iongoni Ecde
Construction of 1no. ECDE Classroom with an office & store, Electrical conduit, shelving to the stores, lockable metallic cabinet, Wooden Desk, Wooden Arm Chairs, Water harvesting goods (10,000Ltrs Water Tank and base), 40 No. Kiddy chairs and 20. No. Kiddy tables, Play equipment 4 piece set (double swing, slide, climbing frame and double see-saw), Display soft board and Branding, Publicity and Signwriting
Construction of 1no. ECDE Classroom with an office & store, Electrical conduit, shelving to the stores, lockable metallic cabinet, Wooden Desk, Wooden Arm Chairs, Water harvesting goods (10,000Ltrs Water Tank and base), 40 No. Kiddy chairs and 20. No. Kiddy tables, Play equipment 4 piece set (double swing, slide, climbing frame and double see-saw), Display soft board and Branding, Publicity and Signwrting
Department of ICT, Education and Internship
Completed
Ksh 2,500,000
Mtito Andei
Kambili Ecde
Construction of 1no. ECDE Classroom with an office & store, Electrical conduit, shelving to the stores, lockable metallic cabinet, Wooden Desk, Wooden Arm Chairs, Water harvesting goods (10,000Ltrs Water Tank and base), 40 No. Kiddy chairs and 20. No. Kiddy tables, Play equipment 4 piece set (double swing, slide, climbing frame and double see-saw), Display soft board and Branding, Publicity and signwriting